This Page Currently Under Construction (Literally)

Train Room (Shell)  -  Train Room (Interior)  -  Layout Design

Layout Construction:  (click on pictures for full view)

April 2008:  

Progress continued on the subroadbed along the NE blob with an emphasis on bringing it around the front edge of the table section and back around the North wall to cross over the lower table and join the middle table section (Level 2).  In the pics below you'll note the subroadbed working its way around the outer edge at a 1% grade, then increasing to about 1.4% along the back wall.  In pic 1, you can see that the transition has been successful and there is sufficient clearance to pass over the lower table risers and subroadbed.

An easterly view of the NE blob and the subroadbed as it transitions to the second level.  Nice clearance.        Looking NW, the NE blob shows off its installed level one subroadbed.  Trains will look way cool coming around this turn on superelevated curves!        A slightly different angle on the NE blob.

Another task in our last session was to complete the design of the Seattle staging yard and to begin laying the track for that yard.  The two pics that follow are essentially the same view, but from a little different angle.  Pardon the mess.  Didn't have a lot of time to tidy up and wanted to get this online.  The tracks to the left of the 4x4 are the lower staging yard tracks.  The trackage to the right of the 4x4 is a container yard, located just south of Boeing Field.  The yard lead passes just inside the risers for the inbound/outbound tracks in the foreground.  The turnout off the lead is a caboose house track.

Lower Staging tracks in the Seattle Yard take shape.        Seattle Yard, complete with staging tracks and a container yard, well, soon anyway! 

In our next edition of the update, we will continue work on the subroad installation along the North wall, this time joining the second level.  Track will start showing up along the west wall in an attempt to catch up to the subroad crew!  Til next time....

 